<?xml version="1.0"?>
<oembed><version>1.0</version><provider_name>Industry Capability Network</provider_name><provider_url>https://icn.org.au</provider_url><author_name>Karen Lenton</author_name><author_url>https://icn.org.au/author/klenton/</author_url><title>LAND 907 Phase 2 and LAND 8160 Phase 1 - Heavy Armoured Capability Systems (HACS) Project - Industry Capability Network</title><type>rich</type><width>600</width><height>338</height><html>&lt;blockquote class="wp-embedded-content"&gt;&lt;a href="https://icn.org.au/project/land-907-phase-2-and-land-8160-phase-1-heavy-armoured-capability-systems-hacs-project/"&gt;LAND 907 Phase 2 and LAND 8160 Phase 1 &#x2013; Heavy Armoured Capability Systems (HACS) Project&lt;/a&gt;&lt;/blockquote&gt;
&lt;script type='text/javascript'&gt;
&lt;!--//--&gt;&lt;![CDATA[//&gt;&lt;!--
		/*! This file is auto-generated */
		!function(d,l){"use strict";var e=!1,o=!1;if(l.querySelector)if(d.addEventListener)e=!0;if(d.wp=d.wp||{},!d.wp.receiveEmbedMessage)if(d.wp.receiveEmbedMessage=function(e){var t=e.data;if(t)if(t.secret||t.message||t.value)if(!/[^a-zA-Z0-9]/.test(t.secret)){var r,a,i,s,n,o=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),c=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]');for(r=0;r&lt;c.length;r++)c[r].style.display="none";for(r=0;r&lt;o.length;r++)if(a=o[r],e.source===a.contentWindow){if(a.removeAttribute("style"),"height"===t.message){if(1e3&lt;(i=parseInt(t.value,10)))i=1e3;else if(~~i&lt;200)i=200;a.height=i}if("link"===t.message)if(s=l.createElement("a"),n=l.createElement("a"),s.href=a.getAttribute("src"),n.href=t.value,n.host===s.host)if(l.activeElement===a)d.top.location.href=t.value}}},e)d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",t,!1),d.addEventListener("load",t,!1);function t(){if(!o){o=!0;var e,t,r,a,i=-1!==navigator.appVersion.indexOf("MSIE 10"),s=!!navigator.userAgent.match(/Trident.*rv:11\./),n=l.querySelectorAll("iframe.wp-embedded-content");for(t=0;t&lt;n.length;t++){if(!(r=n[t]).getAttribute("data-secret"))a=Math.random().toString(36).substr(2,10),r.src+="#?secret="+a,r.setAttribute("data-secret",a);if(i||s)(e=r.cloneNode(!0)).removeAttribute("security"),r.parentNode.replaceChild(e,r)}}}}(window,document);
//--&gt;&lt;!]]&gt;
&lt;/script&gt;&lt;iframe sandbox="allow-scripts" security="restricted" src="https://icn.org.au/project/land-907-phase-2-and-land-8160-phase-1-heavy-armoured-capability-systems-hacs-project/embed/" width="600" height="338" title="&#x201C;LAND 907 Phase 2 and LAND 8160 Phase 1 &#x2013; Heavy Armoured Capability Systems (HACS) Project&#x201D; &#x2014; Industry Capability Network" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&gt;&lt;/iframe&gt;</html><description>Project Details Defence intends to upgrade its Heavy Armoured Capability Systems (HACS), by way of replacement, to the Abrams M1A2 Main Battle Tanks and Abrams M1A1 Combat Engineering Vehicles. Defence also intends to procure Through-Life Support (TLS) for the HACS through an integrated HACS Support System. The global Abrams platform Prime Systems Integrator is General &hellip; Continued</description><thumbnail_url>https://gateway.icn.org.au/images/svg/thin-228_information.svg</thumbnail_url></oembed>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/

Page Caching using disk: enhanced (Requested URI contains query) 

Served from: icn.org.au @ 2021-02-27 19:21:30 by W3 Total Cache
-->